“Partitions, Partitions, Partitions; Robust, Acoustic, Very High & Built for Life”
PJS Solutions “FS” Series Partitions are designed to suit the layout and configuration of each building. Our Structural Engineers design each installation separately. Structural calculations form the basis for the partition design. Our solutions are over engineered so that they never fail. Minimum applied Wind Load for PJS Partitions calculated at 0.2kN/m2 & Wind Load Factor of 1.4
PJS Solutions “FS” Series Partitions are installed by our highly trained professional workforce who are always praised by our clients. From order we can usually be on site within 7 days and can complete within our anticipated build time. International project’s lead time is approx 2/3 weeks greater than the UK due to transportation of materials.
PJS Solutions “FS” Series Partitions are backed by Warrington Fire Certification and where special extreme designs are required further testing can be carried out to obtain the necessary certification. A Warranty supporting both materials and labour is offered for each project.
Methodical, Professional
PJS Solutions “FS” Series Partitions are backed by Warrington Fire Certification and where special extreme designs are required further testing can be carried out to obtain the necessary certification. A Warranty supporting both materials and labour is offered for each project.
Methodical, Professional
We provide a free on-site survey to assist with system selection and also provide a fixed design, supply and installation quotation whilst answering any queries that you may have. Please call us or email to discuss.