PJS Solutions “F120S”® ROBUST FIRE RATED Partition Systems

PJS Solutions “F120S”® ROBUST FIRE RATED Partition Systems PJS_F120S

120 min fire rating

  • Fire Resistant Up To 120 mins
  • Made from Recycled Materials
  • Robust – Severe Rating
  • U – Values = 0.4 to 0.18W/m2k
  • Very High Acoustic Properties
  • Structurally calculated wind loadings
  • High Lateral Strength
  • Up to 50kg per cavity fixing
  • Speedy Installation
  • Only One Type of Board Needed
  • No need for additional patressing
  • No Need For Plywood Backing
  • No Wet Trades Required
  • Resistant to levels of moisture
  • Wall heights up to 15m High

Download Technical Data:

PJS Solutions “F120S” ROBUST FIRE RATED Partition Systems PJS_F120S
PJS Solutions “F120S” ROBUST FIRE RATED Partition Systems PJS_F120S
PJS “FS” Robust Secure Fire Rated Partition Systems PJS_F120S
PJS “FS” Robust Secure Fire Rated Partition Systems PJS_F120S
PJS Solutions “FS” ROBUST FIRE RATED Partition Systems
PJS Solutions “FS” ROBUST FIRE RATED Partition Systems

Our Vision and Mission

PJS Solutions have culminated many years of valuable experience in the design, installation and commissioning of very high fire rated and acoustic “FS” Series Partitions which are structurally engineered for each environment and are installed throughout the United Kingdom and selected worldwide destinations.

Types of installation

Our “FS” Series Partition systems are commonly installed to divide Filming Studios | Sporting Venues| Cinemas |  Theatres |Retail | Industrial Buildings | Warehouses and much more….

Our Clients

Our clients vary from owners of large commercial buildings right through to construction commercial construction companies.

Our Main Specialism

Our main specialism is the design, installation and commissioning of very high fire rated and acoustic “FS” Series Partitions that exceed 10 metres high rising to 26 metres high, however we do cater for ALL partition heights.

Prestigious Projects

We have proudly installed PJS “FS” Series Partitions systems since 2009 and have been fortunate enough to work on very prestigious projects such as the 2012 Olympic Games, 2014 Commonwealth Games in Glasgow and 2015 European games in Baku, Azerbaijan!!